JGC Holdings Corporation (Representative Director, Chairman and CEO Masayuki Sato) announced today that JGC Corporation (Representative Director and President Farhan Mujib), which operates the overseas Engineering, Procurement and Construction (EPC) business of the JGC Group, and as the leader of a consortium with Samsung Heavy Industries (SHI), has been awarded the Engineering, Procurement, Construction, Commissioning (EPCC) contract for a nearshore Floating Liquefied Natural Gas (FLNG) facility project in Malaysia planned by Petroliam Nasional Berhad (PETRONAS), the Malaysian oil and gas company.
This facility will be the first nearshore FLNG in the world as well as the third floating LNG plant to be constructed for offshore gas fields in Malaysia, with a minimum production capacity of 2 million tonnes of LNG per annum and scheduled for completion in 2027. JGC's main responsibilities will cover the engineering, procurement and commissioning work for the FLNG topside, the associated onshore facilities, as well as the management of the overall project. As for the consortium partner, SHI will be responsible for the FLNG hull EPC work and the modular fabrication of the topside.
Since the 1980's, the JGC Group has executed EPC projects for PETRONAS for all nine trains of the LNG plants at the PETRONAS LNG Complex in Bintulu, Sarawak, which has an annual production capacity of approximately 29 million tons per annum, and in 2021 the successful completion of PETRONAS' second FLNG facility, PFLNG Dua, the world's first deep-water FLNG facility currently in production.
As a leading global contractor for LNG and Floating LNG projects, the JGC Group also achieved the Mozambique Coral FLNG 1st Cargo in November of this year. The Group's experience includes two other newly-built EPC FLNG projects out of the total of three in operation around the world, and is currently performing the FEED for an FLNG project in Nigeria.
JGC Holdings Corporation Representative Director, President and COO Tadashi Ishizuka said, "We believe that our consortium secured the order for the PETRONAS FLNG facility project on the basis of JGC's world-leading project management capabilities and the company's advanced and proven technologies in LNG plants, accounting for about 30% of LNG plants worldwide, as well as SHI's world-class shipbuilding capabilities in this field. JGC's strong leadership backed by excellent project management know-how has been demonstrated during the Front End Engineering Design (FEED) stage."
Ishizuka went on to say, "It is our sincere wish to continue to contribute to the realization of planned FLNG plants and LNG plants, with LNG positioned as a key energy transition source. In doing so, JGC will leverage its accumulated experience and achievements, founded on an abundance of high-level execution and technical capabilities."
Saturday, 21 January 2023
Thursday, 19 January 2023
NextDecade and Itochu Corporation Execute 1.0 MTPA LNG Sale and Purchase Agreement
NextDecade Corporation (NextDecade) (NASDAQ: NEXT) announced today the execution of a 15-year sale and purchase agreement (SPA) with Itochu Corporation (Itochu) for the supply of liquefied natural gas (LNG) from NextDecade’s Rio Grande LNG (RGLNG) export project in Brownsville, Texas.
Under the SPA, ITOCHU will purchase 1.0 million tonnes per annum of LNG indexed to Henry Hub on a free-on-board basis.
"We are honored to have Itochu Corporation as our first Japanese customer," said Matt Schatzman, NextDecade's Chairman and Chief Executive Officer. “We look forward to providing Itochu and their customers with LNG, and we are actively working to reduce the carbon footprint of the Rio Grande LNG facility through our proposed carbon capture and storage project.”
NextDecade is currently targeting a positive Final Investment Decision (FID) on the first three trains of the RGLNG export project during the first quarter of 2023, with FIDs of its remaining trains to follow thereafter.
Under the SPA, ITOCHU will purchase 1.0 million tonnes per annum of LNG indexed to Henry Hub on a free-on-board basis.
"We are honored to have Itochu Corporation as our first Japanese customer," said Matt Schatzman, NextDecade's Chairman and Chief Executive Officer. “We look forward to providing Itochu and their customers with LNG, and we are actively working to reduce the carbon footprint of the Rio Grande LNG facility through our proposed carbon capture and storage project.”
NextDecade is currently targeting a positive Final Investment Decision (FID) on the first three trains of the RGLNG export project during the first quarter of 2023, with FIDs of its remaining trains to follow thereafter.
Friday, 13 January 2023
Commissioning of the floating LNG regasification unit delivered by TotalEnergies to Lubmin terminal in Germany
TotalEnergies announces the start-up of the Deutsche Ostsee LNG import terminal for liquefied natural gas (LNG). Operated by Deutsche ReGas and located in Lubmin on the German Baltic Sea coast, the site’s official inauguration will take place tomorrow, attended by German Federal Chancellor Olaf Scholz. This project, to which TotalEnergies is contributing a floating storage and regasification unit (FSRU) and supplying LNG, will make the Company one of Germany’s main LNG suppliers.
In December 2022, TotalEnergies delivered the Neptune – one of the Company's two floating storage and regasification units) – to Deutsche ReGas. The vessel has an annual regasification capacity of 5 billion cubic meters of gas, enough to cover about 5% of German demand.
Following Deutsche ReGas’s open season procedure, in October 2022, TotalEnergies also contracted regasification capacity of 2.6 billion cubic meters of gas per year and began to deliver LNG from its global integrated portfolio to the Lubmin terminal.
“Europe is facing a historic gas supply crisis caused by the sharp drop in flows from Russia. Since the beginning of this crisis, TotalEnergies has mobilized its LNG portfolio, which is broad and flexible, to send available LNG to Europe and to use its 18 Mt/y regasification capacity. Thanks to the start-up of the Lubmin terminal, TotalEnergies will be able to add to this effort and increase its imports to Europe to over 20 Mt/y, or about 15% of the continent’s regasification capacity. We are pleased to support this project, which will allow Germany and Europe to further secure gas supply,” said Stéphane Michel, President Gas, Renewables & Power at TotalEnergies.
TotalEnergies, the world’s third largest LNG and Europe’s leading regasification player
TotalEnergies is the world’s third largest LNG player with a market share of around 10% and a global portfolio of about 40 Mt/y thanks to its interests in liquefaction plants in all geographies. The Company benefits from an integrated position across the LNG value chain, including production, transportation, access to more than 20 Mt/y of regasification capacity in Europe, trading, and LNG bunkering. TotalEnergies’ ambition is to increase the share of natural gas in its sales mix to 50% by 2030, to reduce carbon emissions and eliminate methane emissions associated with the gas value chain, and to work with local partners to promote the transition from coal to natural gas.
In December 2022, TotalEnergies delivered the Neptune – one of the Company's two floating storage and regasification units) – to Deutsche ReGas. The vessel has an annual regasification capacity of 5 billion cubic meters of gas, enough to cover about 5% of German demand.
Following Deutsche ReGas’s open season procedure, in October 2022, TotalEnergies also contracted regasification capacity of 2.6 billion cubic meters of gas per year and began to deliver LNG from its global integrated portfolio to the Lubmin terminal.
“Europe is facing a historic gas supply crisis caused by the sharp drop in flows from Russia. Since the beginning of this crisis, TotalEnergies has mobilized its LNG portfolio, which is broad and flexible, to send available LNG to Europe and to use its 18 Mt/y regasification capacity. Thanks to the start-up of the Lubmin terminal, TotalEnergies will be able to add to this effort and increase its imports to Europe to over 20 Mt/y, or about 15% of the continent’s regasification capacity. We are pleased to support this project, which will allow Germany and Europe to further secure gas supply,” said Stéphane Michel, President Gas, Renewables & Power at TotalEnergies.
TotalEnergies, the world’s third largest LNG and Europe’s leading regasification player
TotalEnergies is the world’s third largest LNG player with a market share of around 10% and a global portfolio of about 40 Mt/y thanks to its interests in liquefaction plants in all geographies. The Company benefits from an integrated position across the LNG value chain, including production, transportation, access to more than 20 Mt/y of regasification capacity in Europe, trading, and LNG bunkering. TotalEnergies’ ambition is to increase the share of natural gas in its sales mix to 50% by 2030, to reduce carbon emissions and eliminate methane emissions associated with the gas value chain, and to work with local partners to promote the transition from coal to natural gas.
Tuesday, 3 January 2023
First LNG cargo arrives at Germany's LNG terminal in Wilhelmshaven
Today, Uniper brought Germany's first full cargo of liquefied natural gas (LNG) to the new LNG terminal, operated by Uniper, in Wilhelmshaven. The LNG ship Maria Energy, owned by Tsakos Energy Navigation, a major energy mover, was loaded in Calcasieu Pass, USA, at the liquefaction facility of the LNG supplier Venture Global Calcasieu Pass, LLC, on December 19, 2022.
The Maria Energy is fully loaded with approx. 170,000 cubic meters LNG (97,147,000 cubic meters of natural gas) – enough to supply around 50,000 German households with energy for one year.
Niek den Hollander, Uniper CCO says: "The successful delivery of the first full LNG cargo to the Uniper terminal in Wilhelmshaven is a testament to the strong partnership between Uniper, Venture Global, and Tsakos Energy Navigation. The use of LNG as a reliable energy source is crucial for the Security of Supply for Germany and Europe. We are committed to contribute our part by bringing more LNG to the European market and especially Germany via the Wilhelmshaven and Brunsbüttel Regas Terminals."
"Venture Global is very proud to supply the first full cargo of LNG ever delivered to Germany, and we congratulate Uniper and the German government for their swift action to build the infrastructure needed to make this historic day possible," says Venture Global CEO Mike Sabel. "As strategic partners, we look forward to providing long-term security of energy supply to our allies through the continued delivery of clean and reliable US LNG."
The LNG cargo delivered on board of the Maria Energy forms part of the commissioning process at the Wilhelmshaven terminal. Commercial operations of the Wilhelmshaven terminal are expected to start in mid-January 2023.
The Uniper LNG terminal in Wilhelmshaven was opened on December 17, 2022. Via the Floating Storage and Regasification Unit (FSRU) Höegh Esperanza, about five billion cubic meters of natural gas can be landed in Germany per year.
The Maria Energy is fully loaded with approx. 170,000 cubic meters LNG (97,147,000 cubic meters of natural gas) – enough to supply around 50,000 German households with energy for one year.
Niek den Hollander, Uniper CCO says: "The successful delivery of the first full LNG cargo to the Uniper terminal in Wilhelmshaven is a testament to the strong partnership between Uniper, Venture Global, and Tsakos Energy Navigation. The use of LNG as a reliable energy source is crucial for the Security of Supply for Germany and Europe. We are committed to contribute our part by bringing more LNG to the European market and especially Germany via the Wilhelmshaven and Brunsbüttel Regas Terminals."
"Venture Global is very proud to supply the first full cargo of LNG ever delivered to Germany, and we congratulate Uniper and the German government for their swift action to build the infrastructure needed to make this historic day possible," says Venture Global CEO Mike Sabel. "As strategic partners, we look forward to providing long-term security of energy supply to our allies through the continued delivery of clean and reliable US LNG."
The LNG cargo delivered on board of the Maria Energy forms part of the commissioning process at the Wilhelmshaven terminal. Commercial operations of the Wilhelmshaven terminal are expected to start in mid-January 2023.
The Uniper LNG terminal in Wilhelmshaven was opened on December 17, 2022. Via the Floating Storage and Regasification Unit (FSRU) Höegh Esperanza, about five billion cubic meters of natural gas can be landed in Germany per year.
Friday, 30 December 2022
Sempra Infrastructure Receives Export Licenses for Two LNG Projects
Sempra Infrastructure, a subsidiary of Sempra (NYSE: SRE) (BMV: SRE), today announced that Energía Costa Azul, S. de R.L. de C.V. (ECA LNG) and Vista Pacifico, S.A.P.I. de C.V. (Vista Pacifico LNG) received authorization from the U.S. Department of Energy (DOE) to re-export U.S.-sourced liquefied natural gas (LNG) from Mexico to non-Free Trade Agreement (FTA) nations. The DOE's significant action is an important milestone for these two development projects, which now are each one step closer to supporting the world's energy security and environmental goals.
"Advancing new infrastructure investments is critical to supporting the energy needs of America's allies, and we are grateful for the leadership of the Biden Administration, U.S. Energy Secretary Jennifer Granholm, and various Congressional stakeholders—including Sens. Joe Manchin, Ted Cruz and John Cornyn. These export projects are expected to support efforts across the Indo-Pacific region to diversify energy supplies while transitioning away from coal in power production," said Justin Bird, CEO of Sempra Infrastructure. "They are also expected to help strengthen U.S. trading relationships, as well as create new jobs and boost the U.S. and Mexico economies."
Under the permits granted by DOE, Vista Pacifico LNG is authorized to re-export up to 200 billion cubic feet per year (Bcf/yr) of LNG from U.S.-sourced natural gas from the project under development in Topolobampo, Sinaloa, Mexico to any country with which the United States does not have an FTA requiring national treatment for trade in natural gas. Vista Pacifico LNG is projected to be a mid-scale facility with approximately 3.5 million tons per annum (Mtpa) of export capacity. Sempra Infrastructure is advancing the development of Vista Pacifico LNG in collaboration with Mexico's Federal Electricity Commission (CFE), as previously announced.
The DOE also increased the authorized export volumes of ECA LNG Phase 2, permitting it to re-export up to 636 Bcf/yr of LNG from U.S.-sourced natural gas from the proposed project in Ensenada, Baja California, Mexico to non-FTA nations. Both permits are applicable for the period beginning on the date of first commercial re-export through December 2050.
The proposed ECA LNG Phase 2 is expected to be comprised of two trains and one LNG storage tank and produce approximately 12 Mtpa of export capacity. ECA LNG Phase 1 received non-FTA export authorization in 2019 and is currently under construction with commercial operations expected in 2025.
Development of ECA LNG Phase 2 and Vista Pacifico LNG is contingent upon completing the required commercial agreements, securing all necessary permits, obtaining financing, and reaching a final investment decision, among other factors.
Sempra Infrastructure Announces Sale and Purchase Agreement with RWE for Port Arthur LNG
Sempra Infrastructure , a subsidiary of Sempra (NYSE: SRE) (BMV: SRE), today announced it has entered into a long-term sale and purchase agreement (SPA) with RWE Supply & Trading, a subsidiary of RWE (RWE: AG), for the supply of approximately 2.25 million tonnes per annum (Mtpa) of liquefied natural gas (LNG) from the Port Arthur LNG Phase 1 project under development in Jefferson County, Texas. The LNG will be delivered on a free-on-board basis for 15 years. The agreement also provides a framework to explore ways to lower the carbon intensity of LNG produced from the Port Arthur LNG Phase 1 project through GHG emission reduction, mitigation strategies and a continuous improvement approach.
"We could not be more excited to finalize our agreement with RWE as we continue supporting the energy security and environmental goals of our European customers," said Justin Bird, CEO of Sempra Infrastructure. "Because of its scale, location and permitting status, Port Arthur LNG is benefitting from a lot of commercial momentum with nearly all the projected off-take capacity for Phase 1 now under long-term agreements with some of the leading global energy companies. Today's announcement moves us one step further along in the process of making Port Arthur LNG a reality."
"Our partnership with Sempra Infrastructure, one of the leading companies for LNG infrastructure in the US, is another important step to diversify Germany's gas supply and thus contributes to enhancing security of supply in Europe on a long-term basis," said Andree Stracke, CEO of RWE Supply & Trading. "Thanks to the LNG supply contract with Sempra Infrastructure, we can also enlarge our international LNG portfolio."
Sempra Infrastructure recently announced it has entered into long-term agreements with ConocoPhillips, INEOS and ENGIE for the sale and purchase of approximately 7.3 Mtpa of LNG from the proposed Phase 1 project. The company is focused on completing the remaining steps necessary to achieve its goal of making a final investment decision for Phase 1 of the liquefaction project in the first quarter of 2023, with first cargo deliveries expected in 2027.
The Port Arthur LNG Phase 1 project is permitted and expected to include two natural gas liquefaction trains and LNG storage tanks and associated facilities capable of producing, under optimal conditions, up to approximately 13.5 Mtpa of LNG. A similarly sized Port Arthur LNG Phase 2 project is also competitively positioned and under active marketing and development.
Development of both phases of the Port Arthur LNG project is contingent upon completing the required commercial agreements, securing and/or maintaining all necessary permits, obtaining financing, and reaching a final investment decision, among other factors.
"We could not be more excited to finalize our agreement with RWE as we continue supporting the energy security and environmental goals of our European customers," said Justin Bird, CEO of Sempra Infrastructure. "Because of its scale, location and permitting status, Port Arthur LNG is benefitting from a lot of commercial momentum with nearly all the projected off-take capacity for Phase 1 now under long-term agreements with some of the leading global energy companies. Today's announcement moves us one step further along in the process of making Port Arthur LNG a reality."
"Our partnership with Sempra Infrastructure, one of the leading companies for LNG infrastructure in the US, is another important step to diversify Germany's gas supply and thus contributes to enhancing security of supply in Europe on a long-term basis," said Andree Stracke, CEO of RWE Supply & Trading. "Thanks to the LNG supply contract with Sempra Infrastructure, we can also enlarge our international LNG portfolio."
Sempra Infrastructure recently announced it has entered into long-term agreements with ConocoPhillips, INEOS and ENGIE for the sale and purchase of approximately 7.3 Mtpa of LNG from the proposed Phase 1 project. The company is focused on completing the remaining steps necessary to achieve its goal of making a final investment decision for Phase 1 of the liquefaction project in the first quarter of 2023, with first cargo deliveries expected in 2027.
The Port Arthur LNG Phase 1 project is permitted and expected to include two natural gas liquefaction trains and LNG storage tanks and associated facilities capable of producing, under optimal conditions, up to approximately 13.5 Mtpa of LNG. A similarly sized Port Arthur LNG Phase 2 project is also competitively positioned and under active marketing and development.
Development of both phases of the Port Arthur LNG project is contingent upon completing the required commercial agreements, securing and/or maintaining all necessary permits, obtaining financing, and reaching a final investment decision, among other factors.
Excelerate Energy Delivers FSRU Exemplar to Finland with Commissioning Cargo
Excelerate Energy, Inc. (NYSE: EE) (“Excelerate”) announced today that its floating storage and regasification unit (“FSRU”), the Exemplar, arrived at the port of Inkoo, Finland on December 28, 2022. The FSRU was previously loaded with a partial cargo of liquefied natural gas (LNG) which will serve as the initial commissioning cargo for the terminal. The FSRU Exemplar, which is chartered to Gasgrid Finland Oy (“Gasgrid”) for a period of ten years, will provide flexible, reliable, and secure delivery of regasified LNG to Finland and other Baltic countries.
“The arrival of the FSRU Exemplar at the port of Inkoo represents an important milestone for Finland as it prepares to enhance its energy security and bring essential energy infrastructure to the region,” said Steven Kobos, President and CEO of Excelerate. “This is a tremendous accomplishment for everyone involved, and we are proud to have partnered with Gasgrid on this opportunity.”
In addition to providing regasification services under the Time Charter with Gasgrid, Excelerate, through its recently formed Finnish gas marketing subsidiary, Excelerate Finland Gas Marketing Oy (“Excelerate Finland”), has executed an agreement for the sale of commissioning volumes and regasification capacity rights during the commissioning phase. Through this agreement, Excelerate Finland will be able to provide natural gas to downstream customers in Finland and other Baltic countries.
The FSRU Exemplar departed drydock in Spain on December 6 where it underwent customer-requested winterization upgrades. The vessel subsequently procured its cargo from Excelerate’s global LNG portfolio via a ship-to-ship transfer with the FSRU Excelsior near Gibraltar. The Excelsior recently completed its 10-year service in Israel and will go on charter to the Federal Republic of Germany in 2023.
The FSRU Exemplar is 291 meters long and 43 meters wide. It has a storage capacity of 150,900 m3 of LNG and can provide more than 5 billion cubic meters per year (bcm/y) of regasification capacity.
“The arrival of the FSRU Exemplar at the port of Inkoo represents an important milestone for Finland as it prepares to enhance its energy security and bring essential energy infrastructure to the region,” said Steven Kobos, President and CEO of Excelerate. “This is a tremendous accomplishment for everyone involved, and we are proud to have partnered with Gasgrid on this opportunity.”
In addition to providing regasification services under the Time Charter with Gasgrid, Excelerate, through its recently formed Finnish gas marketing subsidiary, Excelerate Finland Gas Marketing Oy (“Excelerate Finland”), has executed an agreement for the sale of commissioning volumes and regasification capacity rights during the commissioning phase. Through this agreement, Excelerate Finland will be able to provide natural gas to downstream customers in Finland and other Baltic countries.
The FSRU Exemplar departed drydock in Spain on December 6 where it underwent customer-requested winterization upgrades. The vessel subsequently procured its cargo from Excelerate’s global LNG portfolio via a ship-to-ship transfer with the FSRU Excelsior near Gibraltar. The Excelsior recently completed its 10-year service in Israel and will go on charter to the Federal Republic of Germany in 2023.
The FSRU Exemplar is 291 meters long and 43 meters wide. It has a storage capacity of 150,900 m3 of LNG and can provide more than 5 billion cubic meters per year (bcm/y) of regasification capacity.
Subscribe to:
Posts (Atom)
Glenfarne’s Texas LNG Project Signs Binding Offtake Agreement With Macquarie
Glenfarne Group’s Texas LNG project has signed a definitive 20-year Sales and Purchase Agreement with Macquarie Energy LLC, a subsidiary of...
-
Glenfarne Group’s Texas LNG project has signed a definitive 20-year Sales and Purchase Agreement with Macquarie Energy LLC, a subsidiary of...
-
Argent LNG LCC (Argent LNG) has selected Baker Hughes (NASDAQ: BKR), an energy technology company, as the liquefaction solution and related...
-
A cool down cargo of liquefied natural gas (LNG) from Ras Laffan, Qatar has berthed at the Golden Pass LNG terminal in Sabine Pass, Texas – ...