Eni has signed a contract with Wison Heavy Industry for the construction and installation of a Floating Liquefied Natural Gas (FLNG) unit with a capacity of 2.4 MTPA (million tons per annum). The FLNG will be deployed offshore the Republic of Congo.
The 380 metres long and 60 metres wide vessel will be anchored at a water-depth of around 40 metres and will be able to store over 180,000 cubic meters of LNG and 45,000 cubic meters of LPGs. Preliminary activities have already started, with long lead items ordered and steel cut of cryogenic tanks occurred on December 20th.
This facility will be the second FLNG to be deployed in the Republic of Congo, the first one being Tango FLNG (0.6 MTPA capacity), with LNG production expected to begin in 2023. With the second FLNG, overall LNG production capacity on Marine XII will reach 3 million tons/year (over 4.5 billion cubic meters/year) in 2025.
Both initiatives are part of Marine XII gas valorisation plan, in line with Eni’s strategy to leverage gas equity.
Subscribe to:
Post Comments (Atom)
XRG Agrees to Acquire Interest in Australia's North West Shelf Project
XRG today announced it has entered into an agreement to acquire Shell's interest in the North West Shelf project in Western Australia, ...
-
Glenfarne Group’s Texas LNG project has signed a definitive 20-year Sales and Purchase Agreement with Macquarie Energy LLC, a subsidiary of...
-
A cool down cargo of liquefied natural gas (LNG) from Ras Laffan, Qatar has berthed at the Golden Pass LNG terminal in Sabine Pass, Texas – ...
-
Argent LNG LCC (Argent LNG) has selected Baker Hughes (NASDAQ: BKR), an energy technology company, as the liquefaction solution and related...
No comments:
Post a Comment